November 26, 2008 – IR Summary/IT Examiner.com Chandrayaan-1 has developed some mysterious snag and encountered a rise of 10 degree in temperature, which is sufficient to affect its advanced instruments according to Madhavan Nair, Chairman of Indian Space Research Organisation.
The otherwise uneventful mission has thus far been considered a success. Indeed, 9 scientific instruments on board the ship have been activated and are relaying data, including three-dimensional pictures of the moon's surface.
However, the ISRO is still waiting to activate the High Energy X-ray Spectrometer (HEX) and the Sub keV Atom Reflecting Analyser (SARA). The HEX is slated to survey the moon's polar region for the presence of water, uranium and thorium, while the SARA will analyse the surface composition of the lunar body.
"These are high voltage systems. You have to wait for some time in orbit before they are switched on," Project Director M. Annadurai told the Hindu.
Chandrayaan-1 carries 11 payloads, including a Terrain Mapping Camera (TMC), Hyper Spectral Imager (HySI), Lunar Laser Ranging Instrument (LLRI), High Energy X-ray Spectrometer (HEX), Moon Impact Probe (MIP), Chandrayaan-1 X-ray Spectrometer (C1XS), Smart Near-IR Spectrometer (SIR-2), Radiation Dose Monitor Experiment (RADOM), Sub Kev Atom reflecting Analyser (SARA), Miniature Synthetic Aperture Radar (MiniSAR) and Moon Mineralogy Mapper (M3).
As IT Examiner previously reported, India has already allocated a Rs 425 crore ($86.6 million) budget for the development of the Chandrayaan- II.
"Conceptual studies are in place. Overall configuration is finalised but the scientific experiments are yet to be finalised. It may take six months for finalisation," explained Nair.
The Chandrayaan-2 lander will be manufactured by Russia, while the accompanying moon rover is slated to be jointly designed by New Delhi and Moscow. The payload of Chandrayaan 2 will be finalised after data from its predecessor has been analysed, says ISRO.
Pak hackers planning to attack on Indian cyber networks
Jan 6, 2009
Chandrayaan finds iron-bearing minerals on moon
Dec 27, 2008
Chandrayaan unfolds New Analysis of Lunar Surface
Dec 26, 2008
Russian built Submarine deal –Divided Opinion
Dec 4, 2008
Space Shuttle Endeavour lands safely in California
Dec 1, 2008
Chandrayaan 1 switches of till mid-January due to high temperature
Nov 28, 2008
Chandrayaan 1 has no problem due to rise in temperature
Nov 27, 2008
Chandrayaan-1 records mysterious temperature rise
Nov 26, 2008
India now aims for manned space mission
Nov 26, 2008
Govt. clears Chandrayaan-II to orbit by 2011-12
Nov 18, 2008
Yang, Yahoo Chief, affirms to hold post till successor named
Nov 18, 2008
Bush against Automakers to get bailout, Obama favors help
Nov 18, 2008
India Kiss the Moon
Nov 15, 2008
German Industries are feeling recession
Nov 13, 2008
Govt. may consider bailout for G.M.to avert bankruptcy
Nov 13, 2008
India’s critical test today for Chandrayaan 1
Nov 8, 2008
Ultimate Aim of Moon Missions?
Nov 8, 2008
Chandrayaan – 1 TMC Camera to shoot Moon’s 3D-atlas
Nov 6, 2008
Chadrayaan -1 spacecraft 500 km from Moon
Nov 4, 2008
Chandrayaan -1 taking probe fired to a specific elliptical orbit
Oct 30, 2008
Chandra - distance to the Moon-Perfect Function
Oct 27, 2008
India's manned mission not before 2012: Madhavan Nair
Oct 25, 2008
Dhaka daily hails India's moon mission
Oct 24, 2008
Chandrayaan-I functioning normally: ISRO
Oct 23, 2008
India joins elite club of Countries – Chandratyaan – 1 on way to Moon
Oct 22, 2008
Protest against PM’s inauguration of Kashmir Baglihar hydro-electric project
Oct 10, 2008
Insurance Companies reluctant to insure Chandrayaan – 1 Project
Oct 10, 2008
India to launch first unmanned mission to Moon on 22 Oct. India criticized
Oct 7, 2008
China sees big hurdles for future space goals
Sep 30, 2008
China lauds latest space 'heroes'
Sep 29, 2008